Call us: +91- 9811 142 053,
           9210 300 006
Email Id: info@shivaashray.com


Specific Facilities

STRUCTURE :Brick work cement mortor 1.6(230mm Thick)
     Partition wall with half Brick work in cement mortar(1.4) 115mm Thick finished
  • Sesmic Soundness
  • :Earthquake resistant RCC frame structure
  • External Finish
  • :Exterior point system
    DINNING & PASSAGE
  • Floor
  • :Vitrified floor Tile
  • Walls & Ceiling
  • :Plastered surface and pointed with pleasing shades of plastic Emulsion points
    ALL DEDROOMS
  • Floor
  • :Vitrified floor Tile
  • Walls & Ceiling
  • :Plastered surface and pointed with pleasing shades of plastic Emulsion points
  • Toilet
  • :Branded single lever CP fittings, standard sanitary ware and ceramic tiles.
    KITCHEN
  • Floor
  • :Vitrified floor Tile
  • Walls & Ceiling
  • :Designer ceramic tiles above the centre level, rest plastered surface and painted with
        pleasing shades of plastic/emulsion paint. Ceiling painted with plastic/emulsion paint
  • Others
  • :Granite counter top with Double bowl stainless steel sink
    BALCONIES
  • Floor
  • :Anti skid ceramic tiles
  • Ceiling
  • :As per exterior
    DOOR & WINDOW
  • Interiors
  • :Designer Flush/Modular wooden doors with painted finish & SS finish Accessories on wooden
    frames inside the apartments
  • External Doors & Window
  • :PVC Window
    SECURITY
  • State-os-f-the-art Gadgetry
  • :24*7 Security, CCTV surveillance in the entire Complex to security control room/
         management
  • Entry & Exit Gates
  • :Boom barriers to block vehicular access through a controlled point
    TECHNOLOGY
  • Water Management
  • :Rainwater harvestion system and automatic pressurized water supply
    FIRE PROTECTION
  • Fire Safety
  • :Fire fighting system as per National Building Code
    FACILITIES
  • Club
  • :Swimming pool, Gymnasium, Kids Play Area, Indoor & Outdoor games, Multi-purpose hall & Cafeteria
  • Lifts
  • :Modern high-speed elevators Intercom & camera connected to the security room
  • Others
  • :100% power back-up in common area, Ample parking Space beautifully landscaped.
    RECREATION FACILITIES
  • Swimming Poll
  • Club House
  • Badminton Courts
  • *These will be developed as a comman facility. This enables us to build good quality infrastructure since the coast of construction/maintenance will be shared by many.
    UTILITIES
  • 24 hr power back-up
  • Guard Room along with visitors room.
  • Lifts
  • Landscaped park
  • COMPLIANCE
  • Earth Quake resistant RCC structure.
  • Rain Water harvestion.
  • ENVIRONMENT
  • Waste water Recycling**
  • Mini-Solar units**
  • **Shall cost extra and the final decision will be taken after demonstration by experts and members approval for the extra capital cost.
    ESTIMATED COMPLETION AND OFFER POSSESSION
    Going by current indications we have all the reasons to expect construction to begin by 2015/16. Since this is a new project area and we have completely open lands, the construction is likely progress at double the normal process. Hence we estimate a completion within 2 years from the start of the construction.
    BYE-LAWS OF THE SOCIETY<
    The bye-laws of the Society have approved by the Registrar societies/Distt. North West Govt. of NCT of Delhi.
    SURRENDER OF MEMBERSHIP
    On receipt of written application from the original member for surrender of membership no membership fees will be refunded.
    TRANSFER
    The member can transfer his/her membership without paying any charges for the first transfer. In subsequent transfers the charges Shall be Paid.
    TRANSFER CHARGES
    As decided by the management of the society shall be recovered from the outgoing member.
    SALE
    NOC from society will be required before any transfer of membership.
    *Note: The above specification are only tentative and are subject to drastic changes according to the requirement of construction, modification in building design, floor plan, spedifications adopted, infra-structure, installation etc. and shall be finalized just prior to the commencement of the activity.